kot
kot
48 / 9
2nd May 2011
7th Jun 2011
No Description provided.
russia disaster reactor chernobyl simulation ukraine pripyat nuclear

Comments

  • TEST12345
    TEST12345
    26th Apr 2020
    today is the saddest day :( (26 april)
  • TEST12345
    TEST12345
    11th Mar 2020
    THE REACTOR WAS UNDER THE GROUND!!!!!!!!!
  • Chern
    Chern
    20th Jan 2020
    i agree, the reactor lid wasn't a rectangle.
  • LordOfTheWorld
    LordOfTheWorld
    27th Nov 2019
    Very unrealistic
  • PilotLuke
    PilotLuke
    25th Oct 2019
    Disregard what i said about the 1100 MW.
  • PilotLuke
    PilotLuke
    25th Oct 2019
    @CSLA @monolith The 1000 is the nameplate capacity of the RBMK-1000, however, it could put out 1100MW normally, any power level above it would cause the reactor to overheat abnormally.
  • PilotLuke
    PilotLuke
    25th Oct 2019
    @Dovydas The plan was for 12 reactors, but that got scrappped and reduced to 8 reactors because of a lack of cooling water for 12 reactors.
  • CSLA
    CSLA
    15th Sep 2019
    monolith you dont have truth. 1000 means maximal power. It was 1000 MW reactor. Safe temperature of this reactor was only 300 degress.
  • Dovydas
    Dovydas
    22nd Jun 2019
    12? uhh i think there was only 4 reactors
  • monolith
    monolith
    11th Jan 2014
    astro-nomical you are right. it is RBMK but it have number 1000, because it can to withstand only 1000 degrees, not v100