resic
resic
30 / 2
23rd Nov 2024
17th January
This reactor uses plut as efficiently as possible by using molten plut. It can withstand the huge amount of heat molten plut produces and control it to boil water and create electricity. Project under construction
reactor building complex someuniquetag

Comments

  • resic
    resic
    23rd Nov 2024
    nobodyagain: I think you're using it incorrectly. When the tmp of the molten plut reaches 0 it won't create any heat anymore: you have to renew it. When the whole system reaches a high temperature, the plut won't even convert to stne and you have to hold that temperature by constantly renewing the plut.
  • nobodyagain
    nobodyagain
    23rd Nov 2024
    The only issue with that is the reactor constantly stalls, the automatic system cannot pull out the coolant before the lava turns into stone, and its worse trying it by hand.
  • resic
    resic
    23rd Nov 2024
    nobodyagain: yeah, I know that problem. To minimize the probability of that you should run the reactor at lower temperatures, but it still could happen.
  • nobodyagain
    nobodyagain
    23rd Nov 2024
    The only problem i have found is the wate-pipe instantly nuking the reactor, unless its just to clear out the core before refuel, i would suggest a timer for each activation period.
  • resic
    resic
    23rd Nov 2024
    ok, that was my quickest fp in my life lol
  • resic
    resic
    23rd Nov 2024
    ok, that was my quickest 3 votes in my life lol
  • resic
    resic
    23rd Nov 2024
    AverageAerospaceFan: isn't it? Never seen any other reactor using plut like that but ok.
  • AerospaceFan
    AerospaceFan
    23rd Nov 2024
    i wouldnt say MOST effective but it really is cool