6 Cores. Brand new core that packed 2 core chamber into 6, runs at 9350C. Introducing SLTW-SPNG water making, got rid of BCLN(WATR). Brand new HYGN unit that halfed water consumption. Now you could adjust fuel and coolant more freely.
peak
facility
fusion
steam
reactor
Comments
-
Ok well, WATR + SALT = 2SLTW; 2SLTW via SPNG = 2 SALT + 2 WATR, so water prod. is actually salt prod.
-
how do the water gens work
-
Yeah I used a crappy version of sppc that didnt have much function
-
I thought you used my pipe script but nope, you rawdogged it lol
-
pipe design is fascinating
-
try making a version that survives a bomb
-
as they say in american "ah yes i love when the cooling tower of a nuclear power plant makes steam hot enough to melt tungsten"
-
oh (cts)
-
cindipasi: yeah thats the RegenCoolingSystem, when the heat from heat cycle is too intense, the heat exchanger will melt (intentional design), so what you could try is: 1.let fuel system warm up longer 2.let water system run a bit before turn on heat cycle, the coolant need some time to go to vapor tower
-
love the way the curved pipes look