GottaLoveFlying
GottaLoveFlying
35 / 3
27th June
3:37:14
A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action | Give it a couple minutes to stabilize after loading in | AFW, RCIC unfinished, LOGIC IS A PAIN
complex reactor logic boiling water uranium nuclear uran

Comments

  • KyleTheCreator
    KyleTheCreator
    7th August
    { 0 . 0 }
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    u can select all 4 rods at once bu sparking all 4 buttons at once (paused game) if u dont wanna wait too long
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    added a small deminiralizer to help protect against contaminants entering the CST
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    nest goal is either to finish div 1 2 and 3 ESF or RPS
  • GottaLoveFlying
    GottaLoveFlying
    7th August
    RMCS should now be in a functional state tho missing rod drift, accumulator stuff and rod blocks
  • GottaLoveFlying
    GottaLoveFlying
    6th August
    noooooooooooooooooooooooooooooooooooooo
  • GottaLoveFlying
    GottaLoveFlying
    6th August
    i am missing 4 and gates and i have no space to fit them in
  • GottaLoveFlying
    GottaLoveFlying
    4th August
    the circuit will not expect you to insert and withdraw at once (pausing the game and sparking both) tho i prob will make it prioritize insert
  • GottaLoveFlying
    GottaLoveFlying
    3rd August
    rod insert withdraw and settle timing will be changed when i get to setting the accurate amount of timing (assuming 60 fps)
  • GottaLoveFlying
    GottaLoveFlying
    30th July
    not that accurate tbh