A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action | Give it a couple minutes to stabilize after loading in | AFW, RCIC unfinished, LOGIC IS A PAIN
complex reactor logic boiling water uranium nuclear uran

Comments

  • GottaLoveFlying
    GottaLoveFlying
    27th August
    idk if i should switch up my switches or not cuz nromally the left indicator lamp indicates closed while the right indicates open (for valves), for breakers and switchgears it is left for deenergized and right for energized
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    ok so relief valve insufficient gonna fix it later
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    made the condenser more symmetrical
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    with another power uprate comes a round of ECCS testing
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    ok so time to increase reactor power again
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    the steam flow is so much higher now so i need to optimize the feedwater logic or something
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    maybe mechanical vacuum pumps tho not realistic to use them at power
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    i dont think i will ever add SJAEs as they are way too complex to be made tiny
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    more accurate condenser vacuum
  • GottaLoveFlying
    GottaLoveFlying
    27th August
    the turbine exhaust flow is killing the feedwater heating bruuu