A boiling water reactor, designed to handle DBAs for at least 10 minutes without operator action | Give it a couple minutes to stabilize after loading in | AFW, RCIC unfinished, LOGIC IS A PAIN
complex
reactor
logic
boiling
water
uranium
nuclear
uran
Comments
-
im gonna increase the margin for DIV 3 ESF soon
-
ig they share some trip signals but bru
-
idk why RPS A2 and B1 likes to trip more compared to A1 and B2
-
i really should arrange the RPS trip pushbuttons to be A1 B1 and A2 B2 instead but whatever
-
also 10 second delay between a full scram and RPS trip reset to give the control rods sufficient time to insert
-
if any 1 channel trip in an RPS division (A or B) and any 1 channel trip in the other RPS division, a full scram will occur
-
to clarify the 1 out of 2 twice logic
-
also RCIC is really leaky
-
RPS will trip on a 1 out of 2 twice trip signal and is currently set so systems with 3 or more instruments will require at least 2 instruments to give a trip signal to prevent spurious actuations as well as to still retain reliability when 1 trip signal fails
-
im running into an issue where the RPS trip units are too big