tj_312
22nd Nov 2018
15th Jan 2020
Upgrade the Reactor.
wwww
plant
nuclear
boiler
indicator
power
automation
Comments
-
Optimized the condensor to avoid water jammed inside.
-
Change Tmp of TESC from 7 to 1 to avoid spark TTAN shell of Reactor and damage WIFI outside the reactor.
-
you reuploaded this. -0 votes
-
Thanks
-
I like the status lights
-
us vibr instead of detector wall.
-
@superbroman For boiler part, it's easy to make a feedback according to pressure. But there aren't any flow detector to achieve the feedback for turbine part. So, it's no meaning to make a full automatic system. The automatic adjustable valve is created by myself. Free to copy for anyone like it.
-
make automatic