Boiling Water Reactor (BWR). Startup: disable RHR, withdraw rods, enable RCP, FWP, CND, CCP, HPFH, disable DA BY. On steam generation, enable TB IN and disable TB BY. Makeup as needed. Shutdown: enable RHR, disable RCP, SCRAM. Emergency: LPCI, RCIC, SLC
nuclear
reactor
boiling
realistic
steam
turbine
generator
Comments
-
good +1
-
i very much hate reaktor with no auto (my attention span is 0,62354 seconds) but this is great +1
-
I'm not entirely sure what a NNN switch is in the context of a GE BWR reactor! Could you explain?
-
its a good idea trust
-
Emergency NNN switch
-
there is no way im remembering all those instructions haha
-
Ah, acronyms, the bread and butter of all nuclear engineers. +1