Instructions: Raise rods all the way up until uranium temp reaches 300C. Then lower rods untill the uranium temp balances out. HEAVILY W.I.P.
reactor
explosion
nuke
turbine
meltdown
manual
power
steam
nucular
explode
Comments
-
the containment shouldnt house the control room or anything on the secondary loop other thn SG, stwam lines, MSIV, FW isolation and control and FW lines
-
though it doesnt rlly have a primary loop
-
add more safety system tbh
-
pressurized water reactor
-
goo and plnt just look straight out of a noobs save
-
Why exactly?
-
switch back to rock.
-
To heck with it.i'll use it.
-
KyleTheCreator, yes I do know but, I don't want to use it. I like doing things my own way.
-
you knoe you can make signs display temp using {T} or {temp}