Mr_Bombastick
Mr_Bombastick
14 / 2
7th April
20th April
FUSION stands for F=Future, U=Unlimited, S=Sustainable, I=Intelligent, O=Output, N=Network. still unfinished work in progress(WIP)
swap powerplant fusion reactor power plant nuclear workinprogress project

Comments

  • ca
    ca
    13th April
    forget it itz irelvant
  • ca
    ca
    13th April
    at watr pump station u need to delete the 3 pixels of pipe or it wont get wtr
  • Mr_Bombastick
    Mr_Bombastick
    12th April
    AuricKerg:I fixed it! (if you meant the meltdown)
  • AuricKerg
    AuricKerg
    12th April
    this is slowly fleshing itself out
  • Mr_Bombastick
    Mr_Bombastick
    12th April
    Ok. (cts)
  • KyleTheCreator
    KyleTheCreator
    11th April
    suffering from success.
  • Mr_Bombastick
    Mr_Bombastick
    10th April
    KyleTheCreator: wdym?
  • bideotrai135
    bideotrai135
    10th April
    hhhwhat
  • KyleTheCreator
    KyleTheCreator
    10th April
    guys im suffering from my steak is too juicy and my lobster is too buttery
  • Mr_Bombastick
    Mr_Bombastick
    10th April
    right now I'm trying to make a new tg and condenser, and a backup diesel generator, something in the basement, and control room, and redesign the reactor building.