Hi guys im facing a dilema:
im developing a system that prints firework shells and then fills them (production line if you will)
i was wondering whether i would lose likes if i decide to use the old TPT water timing system or whether i should try modernizing to the dlay system!!!
thanks in advance,,,
I tried but theres a loop hole in my system it just rejects it and starts going crazy
Show us the save.
I would but theres no timing system so its all manual and very confusing
xetalim:
use DLAY!